Duty cycles, SWL envelopes, commissioning timelines and contractor feedback from steel bays, precast yards, ports and power plants.
Each published case follows the same engineering path: duty-group definition, load-chart verification, site readiness, commissioning witness and reliability handoff. Scroll the milestones to see how recent industrial crane programs matured from first inquiry to first safe lift.
Steel-bay overhead fleet standardized on FEM 2m duty with ISO 9001 audit packs.
240-segment viaduct crawler package cleared rainy-season windows with zero rework.
Port gantry electric retrofit cut diesel hours while holding 40.5 t rated SWL.
Power-plant tandem overhead lift synchronized at 125 t per hoist with encoder logs.
High-rise jump-form tower support added wind cut-out telemetry for supervisors.
Connected load-chart dossiers rolled out for EPC engineers of record worldwide.
Names below represent program types and collaboration models — not an endorsement claim beyond published project references.
Reference packs quote lifting capacity (t at radius), boom or span length, hoist speed (m/min), operating weight where mobile, and hydraulic or drive pressure only when instrumented during commissioning.
Example envelope: 50 t at 3 m radius on RT class; 125 t on double-girder overhead with dual hoist sync.
Typical industrial bay: 4–12 m/min main hoist under FEM 2m; continuous mills require documented 3m gearing.
AS 2550 / ASME B30 lift-plan sheets, anti-two-block functional tests, and ISO 4406 cleanliness samples when hydraulics are in scope.
Tell us your SWL envelope, site type and audit standard. We assemble comparable Demag project references with duty cycles, commissioning notes and customer feedback excerpts.